Now owned by Norfolk Southern.
Was a multiple track line with single direction ABS. Double track CTC was installed 1957, described below, enabling the elimination of many towers.
Former crossing with New York Central/Cincinnati Northern Branch.
D TOWER (Wauseon)
Interlocking installed
Closed 1957
Former crossing with Detroit Toledo & Ironton Tecumseh District, abandoned 1978.
DW TOWER (Wauseon)
Interlocking installed
Closed 1950's, remotely controlled from D Tower
Former crossing with Wabash Delta District.
NASBY
Electric interlocking installed 1926
Closed 1998
Crossing with Toledo Terminal Railroad.
SWAN CREEK
Mechanical interlocking installed
Closed around 1980's
Junction with Detroit Line.
BROADWAY
Interlocking installed
Closed 1959
West end Union Station.
Click for Google Map of Toledo
Toledo-Elkhart
Installed 1957, control machine in dispatcher's office at Toledo passenger station